Monday 23 November 2015

Reflection on filming

Between 13th - 22nd November:

We shot most of the city shots all during the those 9-10 days we had; we filmed many of the base tracks and some of the other shots, which we used the storyboard as our guide and found it very important to make sure all the features from the storyboard to be included well.
I think that the overall shots we filmed was effective however one key problem was the weather as it was far to windy at points to even film the shots we needed.
I think the shots filmed earlier in the day was much more effective as the camera was able to capture all the facial features of the singer and it made the shots look visually good.

The location choses were in the city, Albert bridge and Canada Water, these locations were just some of the ones we wished to include. We didn't film everything that we intentionally wanted therefore we will use the footage we have and review it for the rough cut and then from the feedback we will get it will help us shot some last footage before the deadline and edit down some parts that don't look as good. However, we should have filmed extra base tracks due to the fact that one base track's filming was out of sync with the music and too fast, restricting us from using that particular clip, leaving us with one less base track for our music video but still reaching the requirement. The costume the artist wore was exactly what we had planned for her to wear during planning, she wore a white shirt with black jeans and a leather jacket. This contrasted with the other shots we had in the beach location. I think the location choses could of been improved however, the weather restricted us to film in the locations we wanted.


No comments:

Post a Comment